JOHN HOLLAND GROUP FOR NSW LAND AND HOUSING CORPORATION TELOPEA URBAN RENEWAL PROJECT

  • Demolition of all existing structures at Moffatts and Shortland sites including paving, bitumen, concrete or otherwise, ground floor slabs, basement slabs, retaining walls, pits, drainage pits, lift pits, underground fuel tanks (or others as found
  • Safe removal of all asbestos, asbestos contaminated materials, and other hazardous material as stipulated or discovered
  • Provide vibration, dust and noise monitoring, control, and reporting
  • The excavation of all material, or placement and compaction of fill, to the indicated levels within specified tolerances inclusive of all set-out, survey, recovery pegs, batters, benching and shoring as necessary
  • Traffic management planning
  • Design and certification of piles and anchors