JOHN HOLLAND GROUP FOR THE RPA HOSPITAL CAMPERDOWN CHRIS O’BRIEN LIFEHOUSE FACILITY

  • Demolition of all existing structures on site including buildings, roadways, and tunnel walls, as well as the removal of asbestos throughout
  • Bulk and detail earthworks including tunnel removal and tunnel reconstruction works, redirection of services, backfilling over tunnel, ground levelling, basement between shoring walls, and staging works with shoring and anchoring
  • Installation of permanent shoring wall shotcrete and ground anchors
  • Preparation of tunnel walls to receive shotcrete, and shotcrete and finishing works to specifications
  • Supply and compaction of basecourse for tunnel
  • Traffic management planning
  • Erosion, sediment, and environmental protection control